NJ31_WEB
21/32

Photography|1, 3–4, 6:エスエス/SS|2, 5: 日建設計/Nikken Sekkeiスタッフ駐車場(12台)Staff parking lot(12 cars)スタッフ駐車場(12台)Staff parking lot(12 cars)荷捌き、渡り廊下増設Delivery area and connecting corridor (addition)荷捌き、渡り廊下増設Delivery area and connecting corridor (addition)甲山会館(既設)Kozan Kaikan hall (existing)ホール棟(改修)Hall building (renovation)南側立体駐車場(既設)South parking garage (existing)リハーサル棟(改修)Rehearsal building (renovation)会議棟(改修)Conference building (renovation)北側駐車場(102台)North parking lot (102cars)北側駐車場(102台)North parking lot (102cars)自動車・バス|Automobiles/buses歩行者|Pedestrians自転車|Bicyclesバス寄付きBus drop off/boardingバス寄付きBus drop off/boarding甲山焼窯跡保存地区Kozan kiln site preservation area甲山焼窯跡保存地区Kozan kiln site preservation area車椅子使用者用駐車場Barrier-free parking lot車椅子使用者用駐車場Barrier-free parking lot庇新設Newly-established eaves庇新設Newly-established eaves車椅子使用者用駐車場から雨に濡れずにアクセスSheltered access from barrier-free parking lotホール棟、会議棟、甲山会館を庇でつなぐCanopy connecting hall building, conference building, and Kozan Kaikan hall前面道路、北側駐車場からバリアフリーでアクセスBarrier-free access from street at front and north-side parking lotスロープ棟(増築)Slope building (addition)屋外ステージを備えた創造の庭“Creation Garden” with stage楽屋増設Dressing room (addition)フルフラット化外構図|“Full flat” site plan, scale 1:1,400465外構のフルフラット化によるアクセス性向上段差のあった外構をバリアフリー化し、駐車場の整形によりロススペースを削減。バス車寄せを設置しました。Improved Accessibility with Full Flat DesignAccessibility was improved by removing level changes in the exterior spaces of the building. Wasted space was reduced by reconfiguring the parking lot. Pick-up and drop-off areas for buses were added.1:ホール棟の外部ルーバー。|2:東海道五十三次「岡崎 矢矧之橋」を模した緞帳。|3:右の緑地は岡崎城の鬼門鎮護・甲山寺と甲山八幡宮。|4:外観夜景。|5:改修前のエントランス前広場。|6:改修後のエントランス前広場「創造の庭」。1: Exterior louvers of the hall building.2: Curtain tapestry shows Okazaki as depicted in Hiroshige’s “Fifty-Three Stations of the Tokaido.”3: Bird’s eye view.|4: Night view of exterior.5: Entrance plaza before renovation.6: Entrance plaza “Creation Garden” after renovation.N212017 Summer31

元のページ 

page 21

※このページを正しく表示するにはFlashPlayer10.2以上が必要です