43/60

使The 800-seat medium hall is mainly for theater. Thewalls are paneled in locally-produced Hyogo cedar.The foyer catches natural light through the toplights, courtyard and piazza. Building materials are limited to wood, brick, concrete and glass.The 2,000-seat Grand Hall. The mahogany paneling has only clear varnish, so that its redcoloring is clearly expressed.111995200510NIKKEN SEKEI Quarterly 2005 WinterThe opening of the Hyogo Performing Arts CenterYutaka SadoArtistic Director of the Hyogo Performing Arts CenterThe Great Hanshin Earthquake occurred in January1995, 11 years ago. Many died, and the city sufferedenormous damage.Since that disaster, we have joinedhands, helped each other, and learned to reach out fromour hearts amid our grief.Perhaps it is because we areHyogo prefecture that we can build a stronger, kinder city,putting our strength into the development of the citythrough arts and through culture, and it is with that hopethat I took this position as artistic director of HyogoPerforming Arts Center.The Hyogo Performing ArtsCenter opened, at long last, in October 2005, and itsorchestra was born at the same time.From now on, I wantto bring superb music to this center, in moments when theorchestra and audience are united.(Extracted from Nikken Sekkei Quarterly, Winter 2005).Building/ Retaining natural materials452006 FACTNIKKEN SEKKEI

元のページ  index.html#43

  このブックを見る
10秒後に元のページに移動します

※このページを正しく表示するにはFlashPlayer10.2以上が必要です