8/36

Library with a long history1First-phase renovation2015132便 Second floor: Main entrance hall, mens and womens restrooms2Second-phase renovation20158111便3First floor: Sumitomo Collection room, Shoko no Mori (bookshelf forest), library office, mens and womens restroomsThird floor: Main stacks room, memorial roomStudyroomMain stacks roomOsaka reference roomMemorial RoomOsaka reference roomBook storageReference roomBook storageCentral hallMain entrance hallMain entrance doorwayDigital data roomClassics collection roomCafé (planned)Book storageBook storageShoko no Mori roomSumitomo Collection roomReference roomReference room1First-phase renovation2015132便 Second floor: Main entrance hall, mens and womens restrooms2Second-phase renovation20158111便3First floor: Sumitomo Collection room, Shoko no Mori (bookshelf forest), library office, mens and womens restroomsThird floor: Main stacks room, memorial roomStudyroomMain stacks roomOsaka reference roomMemorial RoomOsaka reference roomBook storageReference roomBook storageCentral hallMain entrance hallMain entrance doorwayDigital data roomClassics collection roomCafé (planned)Book storageBook storageShoko no Mori roomSumitomo Collection roomReference roomReference roomEntrance lobbyNewly installed steel posts to support engine boxBase plate: Bolted connectionBase plate: Bolted connectionBase plate: Chemical anchor139.8φ139.8φAdded columnExisting joistsL-shaped angle: Secured with penetrating bolt into existing joistColumn plate: Bolted connectionPost secured to existing floor joists1Anchor fixed at first floorExisting ceiling2FL1FLSectionMain entrance lobby33rd floor plan22nd floor plan11st floor plan, scale 1:1,00012便 21115011The Main Entrance Reopened The key point of the repair and restoration project was to preserve the existing design and decorative features that make the library an Important Cultural Property as designated by the Agency for Cultural Affairs and to minimize alteration to the structure of the building. The first stage of interior renovations consisted of work on the entrance to the second floor that forms the main entry to the library and renewal of the mens and womens restrooms. When the building was originally built, the main entrance was the doorway on the second floor at the top of the great staircase of the main hall. Later, however, the entrance hall became a reading room, and the door was closed for more than 50 of the librarys 111 years. The present project reopened the doorway, restored the interior woodwork in a manner suitable to its role as the main entrance to the library, and installed automatic doors and new lighting fixtures. The automatic-door structure connects inside the ceiling cavity to the self-supporting pillars from the first floor.Self-supporting pillars supporting automatic doors1NFeature | Legacy and Development Over 115 Years082015 Autumn 24WORKS

元のページ  index.html#8

  このブックを見る
10秒後に元のページに移動します

※このページを正しく表示するにはFlashPlayer10.2以上が必要です