Kitasato University Hospital
Kanagawa Prefecture, Japan
Scroll Down
A hospital where clinical care, education, and research can be carried out on an ongoing basis
Redevelopment Plan for the New Hospital at the Sagamihara Campus. The main hospital building was constructed adjacent to the existing hospital (East Wing), and renovations were carried out on the existing structure. Furthermore, as part of the relocation plan following the closure of the East Hospital, the West Wing was constructed adjacent to the main building. By extending the front line—comprising a canopy and a rotary—it became possible to facilitate functional integration.By incorporating exterior utility shafts, an Integrated Support System (ISS), raised floors, and ultra-thin studs, we created a medical space capable of adapting to changes in the healthcare environment. In the patient wards, we minimized patient walking distances by centering the layout around the staff station and nurses’ pit.The “Kitasato University Hospital Smart Eco-Hospital Project” was selected for the Ministry of Land, Infrastructure, Transport and Tourism’s Housing and Buildings CO₂ Reduction Pioneer Project, incorporating eco-shaft natural ventilation, solar power generation, and solar water heating.
| ARCHITECT | The Kitasato Institute |
|---|---|
| Location | Kanagawa Prefecture, Japan |
| SITE AREA | 217,563.95 ㎡ |
| TOTAL FLOOR AREA | Main Building: 92,760.53 m² East Wing (Renovated): 22,613.51 m² West Wing: 10,751.62 m² |
| BUILDING HEIGHT | GL +74.03 m |
| COMPLETION | Construction of the Main Building and Renovation of the East Wing: 2014 West Wing Expansion: 2020 |
SERVICES
DOMAIN
AWARD
- Main Building: IFHE International Building Award (runner-up)
1 /
1












